Feedback form: No changes to be made.
Instructions: Please fill the form with all the relevant date as applicable to your plant,. If not applicable, Please indicate with N.A.
 
1 Introduction
           
1.1 Client's Name*
1.2 Organisational Head (Group Head)  
1.3 Plant Name*  
1.4 Office Address
  Telephone  Fax  Mobile No.  E-mail Id
 
1.5 Plant Location
1.6 Head Office / Registered
Office Address
  Telephone Fax    
     
1.7 Year of establishment      
1.8 Product Manufactured    
1.9 Manufacturing Capacity    
         
  2005-06 2006-07 2007-08 2008-09
1.10 Capacity Utilization of Production
1.11 Output of the product(s)  
1.12 Annual Turnover
         
  Daily Monthly Yearly  
2
Power Requirement (KWH)  
         
2.1 Whether power requirement is being met by State Electricity Board / Distributor
Yes:
No:
     
2.2 Name of SEB/Distributor
* Proposed Financial Year        
         
  2005-06 2006-07 2007-08 2008-09
2.3 Power drawn from SEB / Distributor
2.4 Sanction load (MVA) / KVA
2.5 Brief note on expansion programme, if any
( Please attach separate
sheets, if necessary)
     
2.6 Grid Voltage KV
         
3 Details of fuels
  Fuel-1 Fuel-2 Fuel-3 Fuel-4
3.1 Fuel used for steam generation
tph
3.2 Net calorific values of the available fuel
KJ/Kg
3.3 Gross calorific values of the available fuel
KJ/Kg
3.4 Fuel matrix in Boilers
%
         
  Daily Monthly Yearly  
3.5 Fuel requirement for steam generation  
   
3.6 Composition matrix of mixing of fuels to be used (KJ / KG)
  F-1 F-2 F-3 F-4
3.6.1 Carbon
3.6.2 Hydrogen
3.6.3 Sulphur
3.6.4 Oxygen
3.6.5 Nitrogen
3.6.6 Moisture
3.6.7 Ash
 
3.7 Fuels landed cost (avg.)
3.8 Fuels availability
(0-10 scale)
             
3.8.1 Fuel yard area requirement
m2
3.8.2 Expansion of fuel yard area available
Yes:
No:
   
         
   F-1  F-2  F-3  F-4
3.9 Trend of fuel cost escalation
3.10 Fuel/s cost incurred during last 4 financial year 2005-06 2006-07 2007-08 2008-09
Name of Fuel  
F1
Name of Fuel  
F2
Name of Fuel  
F3
Name of Fuel  
F4
         
4 Steam Detail
         
4.1 System requirement of the process plant
tph
4.2 Pressure of steam in different stages
Kg/m2
4.3 Temp. of steam in different stages
°C
4.4 Condensate steam return to boiler
tph
4.5 Condition of condensate steam
4.6 Future steam requirement
tph
4.7 Quality of future steam
         
5 Raw water details
   
5.1 Source of raw water
5.2 Borewell pump details
5.3 Water table
M
5.4 Water requirements
tph
5.4.1 Potable water
tph
5.4.2 Service water
tph
5.4.3 Process water
tph
         
6 Electrical system details
         
6.1 Total connected load
KVA
6.2 Types of load
KVA
6.3 Max. load at day time
KVA
6.4 Max. load at night
KVA
6.5 Type of Electrical system
LT:
HT:
   
6.6 Consumption pattern
6.7 Load demand growth
%
         
7 Climatic Conditions
         
7.1 Ambient temperature (avg.)
°C
7.2 Ambient temperature (max.)
°C
7.3 Altitude above MSL
M
7.4 Relative Humdity (Max.)
7.5 Environments
Dusty: Non Corrosive:  
7.6 Wind Velocity
7.7 Wind direction
7.8 Seismic Zone
         
8 Soil detail
         
8.1 Soil bearing capacity (T/m2)
8.2 Soil condition
8.3 Soil type
         
9 Area Layout Detail
         
9.1 Area availability for plant      
9.2 Existing area of plant      
9.3 Area of existing power plant      
9.4 Plot plan attached
Yes:
No:
 
       
10 Other Details