|
Feedback form: No changes to be made.
|
| Instructions: Please fill the form with all the
relevant date as applicable to your plant,. If not applicable, Please
indicate with N.A. |
| |
| 1 |
Introduction |
| |
|
|
|
|
|
|
| 1.1 |
Client's Name* |
|
|
| 1.2 |
Organisational Head (Group Head) |
|
|
| 1.3 |
Plant Name* |
|
|
|
| 1.4 |
Office Address |
|
|
|
|
|
Telephone |
Fax |
Mobile No. |
E-mail Id |
|
|
|
|
|
|
|
| 1.5 |
Plant Location |
|
|
| 1.6 |
Head Office / Registered Office Address |
|
|
|
|
|
Telephone |
Fax |
|
|
|
|
|
|
|
|
|
| 1.7 |
Year of establishment |
|
|
|
|
|
| 1.8 |
Product Manufactured |
|
|
|
|
| 1.9 |
Manufacturing Capacity |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2005-06 |
2006-07 |
2007-08 |
2008-09 |
| 1.10 |
Capacity Utilization of Production |
|
|
|
|
|
| 1.11 |
Output of the product(s) |
|
|
|
|
|
| 1.12 |
Annual Turnover |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Daily |
Monthly |
Yearly |
|
| 2
|
Power Requirement (KWH) |
|
|
|
|
|
|
|
|
|
|
|
| 2.1 |
Whether power requirement is being met by State Electricity
Board / Distributor |
|
| |
|
|
| 2.2 |
Name of SEB/Distributor |
|
|
* Proposed Financial Year |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2005-06 |
2006-07 |
2007-08 |
2008-09 |
| 2.3 |
Power drawn from SEB / Distributor |
|
|
|
|
| 2.4 |
Sanction load (MVA) / KVA |
|
|
|
|
| 2.5 |
Brief note on expansion programme, if any ( Please attach
separate sheets, if necessary) |
|
| |
|
|
| 2.6 |
Grid Voltage |
KV |
|
|
|
|
|
|
|
|
| 3 |
Details of fuels |
|
|
|
Fuel-1 |
Fuel-2 |
Fuel-3 |
Fuel-4 |
| 3.1 |
Fuel used for steam generation |
tph |
|
|
|
|
| 3.2 |
Net calorific values of the available fuel |
KJ/Kg |
|
|
|
|
| 3.3 |
Gross calorific values of the available fuel |
KJ/Kg |
|
|
|
|
| 3.4 |
Fuel matrix in Boilers |
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Daily |
Monthly |
Yearly |
|
| 3.5 |
Fuel requirement for steam generation |
|
|
|
|
| |
|
| 3.6 |
Composition matrix of mixing of fuels to be used (KJ
/ KG) |
|
|
|
F-1 |
F-2 |
F-3 |
F-4 |
|
3.6.1 |
Carbon |
|
|
|
|
|
|
3.6.2 |
Hydrogen |
|
|
|
|
|
|
3.6.3 |
Sulphur |
|
|
|
|
|
|
3.6.4 |
Oxygen |
|
|
|
|
|
|
3.6.5 |
Nitrogen |
|
|
|
|
|
|
3.6.6 |
Moisture |
|
|
|
|
|
|
3.6.7 |
Ash |
|
|
|
|
|
|
|
|
|
|
|
|
| 3.7 |
Fuels landed cost (avg.) |
|
|
|
|
|
| 3.8 |
Fuels availability (0-10 scale) |
|
|
|
|
|
| |
|
|
|
|
|
|
|
3.8.1 |
Fuel yard area requirement |
m2 |
|
|
|
|
|
3.8.2 |
Expansion of fuel yard area available |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
F-1 |
F-2 |
F-3 |
F-4 |
| 3.9 |
Trend of fuel cost escalation |
|
|
|
|
|
| 3.10 |
Fuel/s cost incurred during last 4 financial year |
|
2005-06 |
2006-07 |
2007-08 |
2008-09 |
|
Name of Fuel |
F1 |
|
|
|
|
|
Name of Fuel |
F2 |
|
|
|
|
|
Name of Fuel |
F3 |
|
|
|
|
|
Name of Fuel |
F4 |
|
|
|
|
|
|
|
|
|
|
|
| 4 |
Steam Detail |
|
|
|
|
|
|
|
| 4.1 |
System requirement of the process plant |
tph |
|
|
|
|
| 4.2 |
Pressure of steam in different stages |
Kg/m2 |
|
|
|
|
| 4.3 |
Temp. of steam in different stages |
°C |
|
|
|
|
| 4.4 |
Condensate steam return to boiler |
tph |
|
|
|
|
| 4.5 |
Condition of condensate steam |
|
|
|
|
|
| 4.6 |
Future steam requirement |
tph |
|
|
|
|
| 4.7 |
Quality of future steam |
|
|
|
|
|
|
|
|
|
|
|
|
| 5 |
Raw water details |
| |
|
| 5.1 |
Source of raw water |
|
|
|
|
|
| 5.2 |
Borewell pump details |
|
|
|
|
|
| 5.3 |
Water table |
M |
|
|
|
|
| 5.4 |
Water requirements |
tph |
|
|
|
|
|
5.4.1 |
Potable water |
tph |
|
|
|
|
|
5.4.2 |
Service water |
tph |
|
|
|
|
|
5.4.3 |
Process water |
tph |
|
|
|
|
|
|
|
|
|
|
|
| 6 |
Electrical system details |
|
|
|
|
|
|
|
| 6.1 |
Total connected load |
KVA |
|
|
|
|
| 6.2 |
Types of load |
KVA |
|
|
|
|
| 6.3 |
Max. load at day time |
KVA |
|
|
|
|
| 6.4 |
Max. load at night |
KVA |
|
|
|
|
| 6.5 |
Type of Electrical system |
|
|
|
|
| 6.6 |
Consumption pattern |
|
|
|
|
|
| 6.7 |
Load demand growth |
% |
|
|
|
|
|
|
|
|
|
|
|
| 7 |
Climatic Conditions |
|
|
|
|
|
|
|
| 7.1 |
Ambient temperature (avg.) |
°C |
|
|
|
|
| 7.2 |
Ambient temperature (max.) |
°C |
|
|
|
|
| 7.3 |
Altitude above MSL |
M |
|
|
|
|
| 7.4 |
Relative Humdity (Max.) |
|
|
|
|
|
| 7.5 |
Environments |
|
|
| 7.6 |
Wind Velocity |
|
|
|
|
|
| 7.7 |
Wind direction |
|
|
|
|
|
| 7.8 |
Seismic Zone |
|
|
|
|
|
|
|
|
|
|
|
|
| 8 |
Soil detail |
|
|
|
|
|
|
|
| 8.1 |
Soil bearing capacity (T/m2) |
|
|
|
|
|
| 8.2 |
Soil condition |
|
|
|
|
|
| 8.3 |
Soil type |
|
|
|
|
|
|
|
|
|
|
|
|
| 9 |
Area Layout Detail |
|
|
|
|
|
|
|
| 9.1 |
Area availability for plant |
|
|
|
|
| 9.2 |
Existing area of plant |
|
|
|
|
| 9.3 |
Area of existing power plant |
|
|
|
|
| 9.4 |
Plot plan attached |
|
|
| |
|
|
|
| 10 |
Other Details |
|
|
|
|
|
|
|
|
|
| |
|
|