1 |
Introduction |
|
|
|
|
|
|
|
|
|
1.1 |
Client's Name* |
|
|
|
1.2 |
Organisational Head (Group Head)
|
|
|
|
1.3 |
Plant Name* |
|
|
|
|
1.4 |
Office Address |
|
|
|
|
|
|
Telephone |
Fax |
Mobile No. |
E-mail Id |
|
|
|
|
|
|
|
|
|
1.5 |
Plant Location |
|
|
|
1.6 |
Head
Office / Registered Office Address |
|
|
|
|
|
|
Telephone |
Fax |
|
|
|
|
|
|
|
|
|
|
|
1.7 |
Year
of establishment |
|
|
|
|
|
|
1.8 |
Product Manufactured |
|
|
|
|
|
1.9 |
Manufacturing Capacity |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2002-03 |
2003-04 |
2004-05 |
2005-06 |
|
1.10 |
Capacity Utilization of Production |
|
|
|
|
|
|
1.11 |
Output of the product(s) |
|
|
|
|
|
|
1.12 |
Annual Turnover |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Daily |
Monthly |
Yearly |
|
|
2 |
Power Requirement (KWH) |
|
|
|
|
|
|
|
|
|
|
|
|
|
2.1 |
Whether power requirement is being met by State
Electricity Board / Distributor |
|
| |
|
|
|
2.2 |
Name
of SEB/Distributor |
|
|
|
*
Proposed Financial Year |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2002-03 |
2003-04 |
2004-05 |
2005-06 |
|
2.3 |
Power drawn from SEB / Distributor |
|
|
|
|
|
2.4 |
Sanction load (MVA) / KVA |
|
|
|
|
|
2.5 |
Brief note on expansion programme, if any (
Please attach separate sheets, if
necessary) |
|
| |
|
|
|
2.6 |
Grid
Voltage |
KV |
|
|
|
|
|
|
|
|
|
|
3 |
Details of fuels |
|
|
|
|
Fuel-1 |
Fuel-2 |
Fuel-3 |
Fuel-4 |
|
3.1 |
Fuel
used for steam generation |
tph |
|
|
|
|
|
3.2 |
Net
calorific values of the available fuel |
KJ/Kg |
|
|
|
|
|
3.3 |
Gross calorific values of the available
fuel |
KJ/Kg |
|
|
|
|
|
3.4 |
Fuel
matrix in Boilers |
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Daily |
Monthly |
Yearly |
|
|
3.5 |
Fuel
requirement for steam generation |
|
|
|
|
| |
|
|
3.6 |
Composition matrix of mixing of fuels to be used
(KJ / KG) |
|
|
|
|
F-1 |
F-2 |
F-3 |
F-4 |
|
|
3.6.1 |
Carbon |
|
|
|
|
|
|
|
3.6.2 |
Hydrogen |
|
|
|
|
|
|
|
3.6.3 |
Sulphur |
|
|
|
|
|
|
|
3.6.4 |
Oxygen |
|
|
|
|
|
|
|
3.6.5 |
Nitrogen |
|
|
|
|
|
|
|
3.6.6 |
Moisture |
|
|
|
|
|
|
|
3.6.7 |
Ash |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3.7 |
Fuels landed cost (avg.) |
|
|
|
|
|
|
3.8 |
Fuels availability (0-10
scale) |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
3.8.1 |
Fuel yard area requirement |
m2 |
|
|
|
|
|
|
3.8.2 |
Expansion of fuel yard area available |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
F-1 |
F-2 |
F-3 |
F-4 |
|
3.9 |
Trend of fuel cost escalation |
|
|
|
|
|
|
3.10 |
Fuel/s cost incurred during last 4 financial
year |
|
2002-03 |
2003-04 |
2004-05 |
2005-06 |
|
|
Name
of Fuel
|
F1 |
|
|
|
|
|
|
Name
of Fuel
|
F2 |
|
|
|
|
|
|
Name
of Fuel
|
F3 |
|
|
|
|
|
|
Name
of Fuel
|
F4 |
|
|
|
|
|
|
|
|
|
|
|
|
|
4 |
Steam Detail |
|
|
|
|
|
|
|
|
|
4.1 |
System requirement of the process plant |
tph |
|
|
|
|
|
4.2 |
Pressure of steam in different stages |
Kg/m2 |
|
|
|
|
|
4.3 |
Temp. of steam in different stages |
°C |
|
|
|
|
|
4.4 |
Condensate steam return to boiler |
tph |
|
|
|
|
|
4.5 |
Condition of condensate steam |
|
|
|
|
|
|
4.6 |
Future steam requirement |
tph |
|
|
|
|
|
4.7 |
Quality of future steam |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5 |
Raw water details |
| |
|
|
5.1 |
Source of raw water |
|
|
|
|
|
|
5.2 |
Borewell pump details |
|
|
|
|
|
|
5.3 |
Water table |
M |
|
|
|
|
|
5.4 |
Water requirements |
tph |
|
|
|
|
|
|
5.4.1 |
Potable water |
tph |
|
|
|
|
|
|
5.4.2 |
Service water |
tph |
|
|
|
|
|
|
5.4.3 |
Process water |
tph |
|
|
|
|
|
|
|
|
|
|
|
|
|
6 |
Electrical system details |
|
|
|
|
|
|
|
|
|
6.1 |
Total connected load |
KVA |
|
|
|
|
|
6.2 |
Types of load |
KVA |
|
|
|
|
|
6.3 |
Max.
load at day time |
KVA |
|
|
|
|
|
6.4 |
Max.
load at night |
KVA |
|
|
|
|
|
6.5 |
Type
of Electrical system |
|
|
|
|
|
6.6 |
Consumption pattern |
|
|
|
|
|
|
6.7 |
Load
demand growth |
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
7 |
Climatic Conditions
|
|
|
|
|
|
|
|
|
|
7.1 |
Ambient temperature (avg.) |
°C |
|
|
|
|
|
7.2 |
Ambient temperature (max.) |
°C |
|
|
|
|
|
7.3 |
Altitude above MSL |
M |
|
|
|
|
|
7.4 |
Relative Humdity (Max.) |
|
|
|
|
|
|
7.5 |
Environments |
|
|
|
7.6 |
Wind
Velocity |
|
|
|
|
|
|
7.7 |
Wind
direction |
|
|
|
|
|
|
7.8 |
Seismic Zone |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8 |
Soil detail |
|
|
|
|
|
|
|
|
|
8.1 |
Soil
bearing capacity (T/m2) |
|
|
|
|
|
|
8.2 |
Soil
condition |
|
|
|
|
|
|
8.3 |
Soil
type |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
9 |
Area Layout Detail |
|
|
|
|
|
|
|
|
|
9.1 |
Area
availability for plant |
|
|
|
|
|
9.2 |
Existing area of plant |
|
|
|
|
|
9.3 |
Area
of existing power plant |
|
|
|
|
|
9.4 |
Plot
plan attached |
|
|
|
|
|
|
|
|
|
|
| |
|
|